feasibility studies
Preparing feasibility studies is crucial for starting investment projects. Mintec Company is ready to prepare feasibility studies for industrial projects based on its engineering knowledge and design capabilities. The company's engineering and economic team offers feasibility studies as an initial service to help investors make informed decisions by providing insights into the project, financial and economic indicators, and the consumer and export markets.
Some of the projects prepared by the company are as follows:
- 1. Project for the establishment of a lime production factory and calcined lime production for Hormozgan Cement Company with a capacity of 500 tons per day and an approximate value of $18,293,000 (six hundred billion Rials) in 2014.
- 2. Project for the construction of a gypsum board production factory for Sepid Gach Saveh Company with a capacity of 15 million square meters per year and an approximate value of $28,264,000 (nine hundred and fifty billion Rials) in 2014.
- 3. Project for the construction of a cement board production factory with a capacity of 2.5 million square meters and an approximate value of $ 15,652,000 (five hundred and forty billion Rials) in 2015.
- 4.Project for the construction of a precipitated calcium carbonate production factory for Persian Mining Company (Persian Holding) with a capacity of 300,000 tons per year and an approximate value of $ 44,637,000 (one thousand five hundred and forty billion Rials) in 2015.
- 5. Basic and detailed design project for the construction of a copper concentrate production factory using the cementation method with a capacity of 1,700 tons of concentrate per year and an approximate value of $2,443,000 (eighty-nine billion Rials) in 2016.
- 6.Basic design and study project for the construction of a copper concentrate production factory using the cementation method with a capacity of 5,000 tons of concentrate per year and an approximate value of $6,312,000 (two hundred and thirty billion Rials) in 2016.
- 7. Conceptual design and study project for the construction of a cathode copper production factory using the SX/EW + Tank Leaching method with a capacity of 4,500 tons of cathode copper per year and an approximate value of $20,856,000 (seven hundred and sixty billion Rials) in 2016.
- 8.Preparation of the design and feasibility studies for the construction of a lime production factory using a joint venture method with a capacity of 500 tons per day and an approximate value of $17,563,000 (six hundred and forty billion Rials) in 2016.